|
Past Performance Project Narrative |
|||
Solicitation: Vendor Profile Project No.: 910-911 |
|||
|
Contractor: Havlovick Engineering Services, Inc. (HES) |
|||
|
Project/Location: Firemain Loop for the DD(X) Program, Machinery Space Scenario, ex-USS SHADWELL, Mobile, AL |
|||
|
Client: Bath Iron Works, Inc. / U.S. Department of Defense |
|||
|
Master Contract #: PSA No. 7190-0012-A28 |
|||
|
Contract Type: Time & Materials |
|||
|
Brief Description of Project: The Machinery Space Firepump Compartment was a design and installation of pumps, piping and controls to provide an automated fire suppression system for the DD(X) project. This project required the following engineering disciplines: mechanical, fluids, electrical, and instrumentation and controls.
The complete system was also managed and installed by HES personnel, assuring customer satisfaction. |
|||
|
Additional Views |
HES POC |
||
|
Mr.
Bradley Havlovick
|
|||
|
|
|||
|
Home
| Piping
Systems | HVAC
Systems | Structures |
|||