Past Performance Project Narrative |
|||
|
Solicitation: Vendor Profile Project No.: 931 |
|||
|
Contractor: Havlovick Engineering Services, Inc. (HES) |
|||
|
Project/Location: PC Control of Rupture Valves for the DD(X) Program, Wartime Combat Scenario, ex-USS SHADWELL, Mobile, AL |
|||
|
Client: Bath Iron Works, Inc. / U.S. Department of Defense |
|||
|
Master Contract #: PSA No. 7190-0012-A28 Prime Contract #: N00024-02-C-2302 |
|||
|
Contract Type: Time and Materials |
|||
|
Brief Project Description: PC Control of DD(X) Rupture Valves was designed and implemented to aide in the testing of the DD(X) Automated Fire Suppression System Engineering Development Model (AFSS-EDM) onboard the ex-USS SHADWELL. This effort included engineering in controls, electrical, and mechanical disciplines as well as building, installation and testing of a control box and field devices. PC Control of the Rupture Valves allowed an operator to simulate a rupture in the piping system by remotely opening the rupture valves. · The Human Machine Interface (HMI) provided open/close operation of the rupture valves as well as open/close status feedback from the actuators. · HMI and control operations were obtained through the use of National Instruments’ LabView 7.1 software and Compact Fieldpoint controller and I/O modules. · Electro-mechanical relays were used to allow 120 VAC control of the actuators by the 24 VDC Compact Fieldpoint relays. |
|||
|
Additional Views |
HES POC |
||
|
Havlovick Engineering Services, Inc.
|
|||
|
Home
| Piping
Systems | HVAC
Systems | Structures Computer Aided Engineering (CAE) | Computer Aided Drafting (CAD) | Past Project List - All Project Types |
|||